Wall between office and conference room.

Cedar installed under window frame.
   

Side wall in Conference room that needed extended repairs.

Looking at light fixtures. (Pretty cool - huh?)
   

Looking at possible flooring samples.


Still looking...

   

Some offices will have cedar trim.

Some offices will keep the original trim.
   

"Rough-in" for sewer plumbing in new bath/shower room.

New windows installed. (Energy efficient.)
   

The last of the old comes out.

New entrances will allow access from crew area to bathrooms.
   


Office in Dispatch - note the cedar fill in below the truss.


This is more of the "re-used" cedar that was taken from the old walls.

   

Back rooms behind Dispatch. Cabinets/Kitchenette on the Left.

Bathroom on the right - Note this wall will be used as the "map" wall.
   

New wall for Phone/Server room.

This is where the wheel-chair lift will go.
   

Preparations for new gutters and new roofing over flat roof area.

"Bombed-out" roof will be replaced by solid fully framed roof.